Operational consulting
Using simulation, we help you optimise your operations. We model how work flows through your people, equipment, schedules and queues, then test changes virtually to find the best way to run before you commit time or money.
-
Trade studies
Compare options side by side on cost, time, capacity and risk. For example: two site layouts, owning versus renting equipment, or in-house versus outsourced work.
-
Sensitivity analysis
Find which inputs really drive the result. For example: how delivery delays, crew availability or energy prices change completion time and cost, and where a plan breaks.
-
Parametric analysis
Vary one decision step by step to find the sweet spot. For example: crew size against schedule, shifts or machines against throughput, storage capacity against cost.
Try it — find the best crew size
An illustrative 1,200 crew-day project. More people finish sooner but get in each other's way; every extra day on site costs overhead. Move the sliders to see where the total cost is lowest.
- Duration
- –
- Total cost
- –
- Lowest-cost crew
- –
Illustrative model for demonstration. Real studies use your own data and constraints.
Built on published research in simulation, trade studies and optimisation.
- 11
- peer-reviewed publications
- 228
- research citations
